- All
- Completed Project
Project No-01-United Anuwara Power Ltd. 315MW. Power Plant, Chittagong
Project No-02- Baraka Power Ltd. Chittagong
Project No-03- United KEPZ 50MW Power Plant, Chittagong
Project-4, Gopalganj 100MW Peaking Power Plant. (BBC), Engine Block in-out, Jacking, Skidding and Alignment – 1 Units (24.09.2019 To 15.10.2019)
project-5, Siemens BD Ltd. Sreepur, Mauna, Gazipur. (MKK) Transformer – 125 Ton, Jacking, Skidding and Alignment – 2 Units (22.09.2019 To 12.10.2019)
project-6, Global Cement, Shun Shing Group, Shikalbaha, Chittagong (MKK), 164.222 Ton 2 Unit, loading of above cargo on to trailer at Barge, Unloading at site from Trailer skidding & positioning, (22.02.2020 To 25.02.2020)
project-7-United Jamalpur Power Ltd 200MW Power Plant, Jamalpur. (Wartsila), , Rigging support for alternator coupling changes DG # 3, ALTERNATOR 32 tons – 1 Units (04.05.2019 To 12.05.2019)
project-8, United Jamalpur Power Ltd 200MW Power Plant, Jamalpur (Wartsila), Heavy Lifting Support (alternator body crack) UJPL/04 DG5-5 ALTERNATOR -32 Ton – 1 Units. ( 22.07.2019 To 25.07.2019)
project-9, United Jamalpur Power Ltd 200MW Power Plant, Jamalpur. (Wartsila), Rigging support for alternator lift up & shifting from base to side way. ALTERNATOR , (03.05.2020 To 08.05.2020)
Project-10, Orion Power Plant Meghnaghat, Narayangonj. (IPL), Jacking, Skidding, Leveling & Positioning. Wartsila Engine 280 tons-6 Units- Alternator-72 Ton – 6 Units( 24.01.2020 To 31.01.2020)
project-11- IPL INTERNATIONAL (BD) PVR.LTD. GULSHAN-2, DHAKA-1212. Cooperate with Project Work at Asharirchar, Meghnaghat Orion Project. 150 Ton Crawler Crane Rent for One Month ( 10.02.2020 To 10.03.2020 )
project-12- IPL INTERNATIONAL (BD) PVR.LTD. GULSHAN-2, DHAKA-1212. Cooperate with Project Work at Asharirchar, Meghnaghat Orion Project. 150 Ton Crawler Crane Rent for 15(Fifteen Days) 11.03.2020 To 31.03.2020
project-13, Mirsarai EPZ 150MW Power Plant. (MAN), Lifting Turbo Charger 4-unit 16 Ton, 25.06.2020 To 17.07.2020
project-14, Mirsarai (Dual Fuel) 150MW Power Plant. Mirsarai economic Zone, CTG (IPL), Centering, joining, Leveling, Alignment, Man Engine 325 tons- 9 Units, Alternator – 9 Units-72 Ton ( 31.05.2020 To 17.07.2020)
project-15- Khulna 330MW (200-300MW) Combined Cycle (Dual Fuel) Power Plant, Khalishpur, Khulna. (IPL), , Heavy Lifting, 62 Ton 2 Unit., 16.05.2020 To 28.05.2020
Project-16, China Energy Engineering Group Northeast No. 1 Construction Co. Ltd. (NEPC), Narayangonj. Transport of goods from the Payra Site the Meghnaghat II Gas Turbine Engineering EPC Project. 23.07.2020 To 13.08.2020
Project-17, IPL INTERNATIONAL (BD) PVR.LTD. GULSHAN-2, DHAKA-1212, 115MW HFO, Chandpur Power Generations Limited, Icholi, Chandpur. Khulna CCCE Project. 01.07.2020 To 02.11.2020 50 Ton Crawler Crane Rent for One Month, Additional Time Five Month.
project-18, Summit Meghnaghat II Power Company Ltd.-590/541MW, Dual Fuel Combined Cycle Power Plant, Baranagar, Sonargaon, Narayangonj. , 80 Ton Mobil Crane 1 Nos, High bed trailer 8 Nos.01.08.2020 To 25.03.2021
Project-19, Summit Meghnaghat II Power Company Ltd.-590/541MW, Dual Fuel Combined Cycle Power Plant, Baranagar, Sonargaon, Narayangonj.Sheet pile Loading Unloading WORK
Project-20, Energypac-108MW, HFO Based Power Plant, Kolagaon, Potiya, Chittagong. Engine Block Lifting, Jacking, Skidding, Positioning, 1 Unit. 12.11.2020 To 20.11.2020
Project-21, Summit Meghnaghat II Power Company Ltd.-590/541MW, Dual Fuel Combined Cycle Power Plant, Baranagar, Sonargaon, Narayangonj. 225 M.ton Modular, Heavy Lifting, Jacking, Skidding, Unloading from Barge Loading into SPMT Trailer. 05.01.2021 To 15.01.2021
Project-22, Energypac-108MW, HFO Based Power Plant, Kolagaon, Potiya, Chittagong. 1 Unit Crankshaft Stand Sell , 20.05.2021
Project-26, Patuakhali 1320 MW Power Plant, 100 Ton 27 Units Beam Loading Unloading, River Transportation, Project Site Road Transportation. 24.01.2022 To 09.03.2022
Project-27, Patuakhali 1320 MW Power Plant, 300 M.ton Crawler Crane Mobilization at Meghnaghat
Project-28, Summit Meghnaghat II Power Company Ltd.-590/541MW, Dual Fuel Combined Cycle Power Plant, Baranagar, Sonargaon, Narayangonj., 240 Ton 3 Units Transformer unloading from HMT Trailer Jacking, Skidding, Positioning, 02.03.2022 To 06.03.2022
Project-31, Modern Polymer ltd, 53-ton 6 units Engine unloading from HMT Trailer Jacking, Skidding, Positioning, 16.03.2022 To 20.03.2022
Project-35, IPCO Development (Bangladesh) Limited, United Group, Dhaka Airport, Dhaka, Transportation From CTG to Dhaka Airport & Installation of 6 Nos Chiller 23 M.ton, 15.04.2022 To 16.04.2022